Large batch of construction equipment and miscellaneous materials
25 days
Large batch of construction equipment and miscellaneous materials
Description :
- Environ 500 pieces in total
- Collection will take place from Monday to Friday to allow enough time to collect everything
- Beams / planks
- Wooden panels or plywood
- Scrap wood
- Construction props
- Galvanised metal tubes
- metal profiles
- Aluminium ladders
- Metal storage racks
- metal trestles
- Formwork panels
- Metal formwork panels
- Various formwork components
- Several orange PVC pipes (drainage)
- Black conduits or pipes in coils
- White plates
- Grey slabs or panels
- Concrete or engineered stone slabs
- Stacked blocks or paving stones
- Precast concrete elements
- blue rubble skips
- Several buckets
- paint or plaster
- Bags of rubble or building materials
- A large number of wooden planks stacked up
- wooden pallets
- Debris and loose materials on the ground
- Arrange for the unit to be dismantled for transport, or ensure a suitable vehicle is available to avoid the need for dismantling
- Heavy!
- Estimate the number of people required for a handling operation
General remarks:
- The buyer is supposed to have visited the items before his bidding in anticipation of the possible dismantling, disconnection or any other handling for the withdrawal of his purchase
Start price
250 € VAT EXCLUDED
or 250 € TVAC
or 250 € TVAC
You have to enter 250&euro € VAT or more
The selling costs are already included in the amount of your bid
1
The selling costs are already included in the amount of your bid
Any bid placed at the end of the sale will extend it by 5 minutes until there is no more bid
If you win the auction, you are required to pay, you can do so via :


What is the difference between a fixed bid and a max bid?
Reference
J-13276-1
Seller type
Professional
Source
Bankruptcy
Distribution of responsibilities
Clictelia is not itself the seller and acts solely as an intermediary on behalf of third-party sellers;
Clictelia issues the invoice and collects the payment.
Third-party sellers are responsible for the right of withdrawal and the legal guarantee of conformity where applicable.
Clictelia issues the invoice and collects the payment.
Third-party sellers are responsible for the right of withdrawal and the legal guarantee of conformity where applicable.
Right of withdrawal
No
Legal guarantee
No
Category
State
Used
Visit
by appointment
Friday Aug 21 2026 at 10:00 AM
End of auction
Friday Aug 21 2026 at 9:00 PM
Removal of the goods
Monday Aug 24 from 10:.
The precise schedule will be communicated to you a few days before pick-up.
Location
5410 Beyren Flaxweiler, Luxembourg - Luxembourg
Number of views
486
Number of bids
0
Discover similar products on sale...
See all products in this category Construction & civil engineer










